The Stanford University Medical Center required a new parking facility and turned to Vance Brown Construction to build the job. Vance Brown subcontracted with Condon-Johnson and Associates (CJA) to install 65,000 square feet of soldier pile and lagging shoring.

The Challenge
The project included a subgrade parking structure that had a footprint of approximately 72,000 square feet and a depth of 58’.

The Solution
141 soldier piles were installed to depths of 70’ with the use of a Taurus XL drill in the clayey gravel of the site. Four rows of grouted strand tiebacks were installed by Klemm using duplex drilling methods.

The Result
The entire shoring job was completed in twelve weeks at a cost of $ 1.95 million.

Featured Expertise:

Shoring/Soil Nailing

 

 

 

C700
Fay Avenue
Grantville
HWY 5/805 Interchange
Interchange 57/60
Jenner HWY 1
Edmonds
Naval Amphibious Base
Pier 400
Red Top
Reno RETRAC
San Quentin Prison
Sante Fe Station
Stanford Parking Garage
Terry Avenue
Walnut Creek

 

 

 

 

 

 


2007 ©Condon Johnson & Associates



Areas of Expertise | Scope of Services | Offices | News | About Us
Seattle | Oakland | Los Angeles | San Diego

Site Map

Design by AT

Condon Johnson Home Page